The Plan

What we are building, in the order we intend to build it

Timeline to be announced

PHASE ONE

TBA

Planned

Phase One — Ground and Groundwork

PLACEHOLDER: site preparation, grading, and utilities for the future campus. Replace with the school's approved scope.

PHASE TWO

TBA

Planned

Phase Two — The Academic Building

PLACEHOLDER: classrooms, library, and commons for Pre-K through 7th grade. Replace with the school's approved scope.

PHASE THREE

TBA

Planned

Phase Three — Fields and Fellowship

PLACEHOLDER: athletic fields, playground, and gathering spaces. Replace with the school's approved scope.

The Future Campus

A three-dimensional model of the campus is in the works

This space is reserved for the interactive model of the campus plans. Until it is ready, the massing study below stands in its place.

Massing study of the future campus, showing a central hall, classroom wings, and courtyards
Placeholder massing study — not a final design. To be replaced by the school’s 3D campus model.

Stewardship

How gifts are held and spent

Placeholder stewardship language. Gifts to the campaign are designated for the campus project and held separately from operating funds. The board reviews campaign expenditures at each regular meeting, and a summary is published to donor families annually.

If a phase is completed under budget, the surplus advances the next phase. Should the campaign not reach its goal, gifts remain designated for campus work as approved by the board.

Give Toward the Plan